Best NeocloudsAn independent guide to GPU clouds

Compare GPU clouds / Radiant (formerly Ori)

Radiant (formerly Ori)

Brookfield-backed AI cloud that absorbed Ori in February 2026

Mid-size cloudEurope

Brookfield launched Radiant in February 2026 by merging with Ori Industries; Ori’s Global AI Cloud continues as the Radiant AI Cloud, and ori.co now redirects to radiant.co. It offers GB300 NVL72 and H200 with managed Kubernetes and Slurm, and is building a UK AI factory of up to 1 GW with Drax. Ori founder Mahdi Yahya is Radiant’s President and CEO.

Best for: Sovereign or enterprise GPU capacity on long-term contracts in the UK.

ClusterMAX 3.0: Participation (as Radiant)

  • – Publishes prices
  • – Serverless inference
  • – AMD GPUs
  • ✓ European data centers
Visit Radiant (formerly Ori)

Facts checked November 9, 2026 against the sources listed below. Radiant (formerly Ori) does not pay to appear here.

1 Legal nameOri Industries
2 HeadquartersNot disclosed
3 FoundedNot disclosed
4 Funding or listingMerged into Radiant, a Brookfield AI Infrastructure Fund portfolio company (Feb 2026).
5 How you rentOn-demand, Reserved clusters, Bare metal
6 Minimum commitmentNot disclosed
7 InterconnectGB300 NVL72: ConnectX-8 SuperNIC at 800 Gb/s per GPU, Quantum-X800 InfiniBand or Spectrum-X Ethernet
8 OrchestrationKubernetes (managed), Slurm (managed), FlightDeck (monitoring)
9 GPUs offeredGB300 NVL72, H200, Vera Rubin NVL72 (stated as next generation)
10 RegionsUK (Drax AI factory, up to 1 GW, per Radiant)
11 CertificationsNot disclosed
12 Customers and partnersNVIDIA Cloud Partner; partnership with Drax for a UK AI factory; backed by Brookfield.

Published prices

Radiant (formerly Ori) does not publish on-demand prices. Ask for a quote.

Worth knowing before you sign

  • No public prices (radiant.co/pricing returns 404); access is through “Talk to an architect”.
  • Since the merger the focus is sovereign and enterprise long-term contracts.
  • Rated in the Participation tier of ClusterMAX 3.0 under the Radiant name; Ori itself is not listed.
  • No certifications are stated on the pages checked.

Go to Radiant (formerly Ori)'s site

Sources

  1. Radiant: Ori merger FAQ
  2. Radiant launch press release
  3. Radiant GPUs
  4. Radiant about
  5. SemiAnalysis ClusterMAX 3.0 ratings

Work at Radiant (formerly Ori)? Send corrections with a source to editors@bestneoclouds.com. We fix verified errors within five business days.

Compare with

  • Nebius Full-stack AI cloud with published on-demand GPU prices (NASDAQ: NBIS)
  • Nscale European AI cloud selling GB300 and B200 capacity (S-1 filed for NYSE: NSCL)
  • Together AI AI cloud for GPU clusters and model inference
  • Runpod Self-serve GPU cloud with per-second Pods, Instant Clusters and serverless endpoints
  • Hyperstack Self-serve GPU cloud from UK-based NexGen Cloud